Jonathan Farmer, P.E.

Jonathan Farmer, P.E., a regional manager with KSA, has been with the firm since 2006.
As a project manager, Jonathan administers the planning, design, and construction phase engineering on a variety of airport and municipal projects. The scope of his work primarily focuses on airports, but he also has experience in storm water and street improvements and wastewater collection systems.
Jonathan had been involved with the design and construction of multiple projects throughout Louisiana and Texas. He has extensive knowledge in project scope development, cost estimating, preliminary and final design, and construction administration.
Customer Reviews
Leave a Review
Associated Projects
KSA’s services were requested by the Chennault International Airport Authority to develop a comprehensive project to replace the aged lighting syst
KSA was hired to reconstruct Runway 4-22 and relocate the instrument landing system (ILS) to Runway 4.

In 2017, KSA was selected by Chennault International Airport to conduct an Environmental Assessment for the acquisition of approximately 235 acres

Planning at Chennault International Airport (CWF) is unlike planning at any other general aviation (GA) airport because CWF is more than an airport

As part of a multi-year contract, KSA was engaged to conduct a study that would determine the load-bearing capacity of Runway 15-33 and its connect