Brittney Smith, P.E.

Since graduating from Texas A&M University with a Bachelor’s degree in civil engineering, Brittney has been designing engineering solutions for a wide range of project types. Her diverse background includes engineering design for roadways, multi-use trails, utility installation, drainage, aviation, and water/ wastewater treatment. She has had the privilege to serve both public and private entities during her career. Working with clients on design and construction of projects that aim to better serve their communities is what she enjoys. She has worked on projects with both state and federal funding and understands the coordination efforts involved with such projects. Brittney recognizes the importance of clear communication and strives to meet the needs and expectations of her clients.
Customer Reviews
Leave a Review
Associated Projects
The City of Longview selected KSA to repair an existing raw water intake at Lake O’ The Pines.

KSA, as partners/sponsors with its SDVOSB teammate (DBC), is designing the $29M+ Phase 2 expansion of the Miramar National Cemetery in San Diego, C

KSA was hired to help the city develop a 10-year strategic plan, vision and branding strategy that would provide a roadmap for the city’s future.

To provide continuity in Longview’s trail system, the city hired KSA to link sections of existing trails – a continuation of the trails master plan
As a tenant of downtown Longview, KSA has a vested interest in the success of its revitalization.