Water
Tyler Lake Palestine Water Treatment Plant

Tyler, Texas

Water Treatment Plant Improvements
 In 1998, KSA Engineers began the planning and design for a project to deliver up to 35 mgd of treated water from Lake Palestine to the
City of Tyler.  Upon completion of the planning phase, the project consisted of a 35 mgd raw water pump station at Lake Palestine, 8
miles of 54-inch raw water line and a 30 mgd water treatment plant. 

KSA was responsible for all design and construction associated with all phases of the project.  This included a treatability analysis of
the water from Lake Palestine.  The selected treatment process included conventional clarification using alum and lime, dual media
sand filters and ozone disinfection.
Austin High Service Pump Station #2
Copeland Road Elevated Storage Tank
Crockett Raw Water Transmission Facilities
Diana USDA Funded Water System
Gladewater WTP Improvements Phase I
Groesbeck Dam Improvements
Groesbeck Downtown EST Replacement
Groesbeck Water Distribution System
Houston Water
Facility Improvements
Jacksboro Lift Station No. 2 Replacement
Jacksboro Lost Creek Dam Evaluation & Plan
Lake Palestine Water Treatment Plant
Longview George Richey Road 18"
Longview Water Treatment Plant
Marlin DWSRF Water Treatment Plant
Marlin Water Transmission Main
Mexia Water
Treatment Plant
Morgan's Point Downtown EST
Nacogdoches Elevated Storage Tank
Nacogdoches Southside Ground Tank
Nacogdoches Water Treatment Plant
Reno TCDP Water System (ORCA)
Rockdale Water Distribution System
Selma Elavated
Storage Tank
Selma High Service Pump Station
Selma Southside Water System -IH 35 Crossing
Sugar Land 16" Water Main Ext.; S.H.6 South
Sugar Land Levee District No. 2 Culvert
Copyright© 2010 by KSA Engineers Inc.,  Site Map | Employee Access