Jacksboro Lost Creek Dam Evaluation and Action Plan
Jacksboro, Texas
Jacksboro Lost Creek Dam Evaluation and Action Plan
KSA Engineers, Inc. was hired by the City of Jacksboro to evaluate the Lost Creek Dam and the Lake Jacksboro Dam.

The project included:

  • Inspection of Lake Jacksboro and Lost Creek Dams
  • Preparation of dam inspection report for both dams
  • Preparation of emergency action plan for dams

Following TCEQ inspections, KSA was hired to review the TECQ findings; evaluate both dams; prepare a report to submit to the TCEQ
which would address the TCEQ’s concerns and update the Emergency Action Plan for both dams; and make recommendations to the
City for measures that the City would need to take to stay in compliance with the TCEQ.

Austin High Service Pump Station #2
Copeland Road Elevated Storage Tank
Crockett Raw Water Transmission Facilities
Diana USDA Funded Water System
Gladewater WTP Improvements Phase I
Groesbeck Dam Improvements
Groesbeck Downtown EST Replacement
Groesbeck Water Distribution System
Houston Water
Facility Improvements
Jacksboro Lift Station No. 2 Replacement
Jacksboro Lost Creek Dam Evaluation & Plan
Lake Palestine Water Treatment Plant
Longview George Richey Road 18"
Longview Water Treatment Plant
Marlin DWSRF Water Treatment Plant
Marlin Water Transmission Main
Mexia Water
Treatment Plant
Morgan's Point Downtown EST
Nacogdoches Elevated Storage Tank
Nacogdoches Southside Ground Tank
Nacogdoches Water Treatment Plant
Reno TCDP Water System (ORCA)
Rockdale Water Distribution System
Selma Elavated
Storage Tank
Selma High Service Pump Station
Selma Southside Water System -IH 35 Crossing
Sugar Land 16" Water Main Ext.; S.H.6 South
Sugar Land Levee District No. 2 Culvert
Copyright© 2010 by KSA Engineers Inc.,  Site Map | Employee Access