Gladewater Water Treatment Plant Improvements - Phase I
Gladewater, Texas
Water Treatment Plant Improvements
In 2003, the City of Gladewater authorized improvements for the City’s water treatment plant. To respond to immediate THM problems in
the finished water, the City hired KSA Engineers, Inc. to develop plans for improvements.

The first phase of construction consisted of the installation of a chloramine system as well as feed equipment for other water treatment
chemicals.

KSA designed a panel near the clearwell with analytical equipment in it and analytical equipment in the filter pipe gallery.  The firm also
designed two manholes and extra piping to complete the project.
Austin High Service Pump Station #2
Copeland Road Elevated Storage Tank
Crockett Raw Water Transmission Facilities
Diana USDA Funded Water System
Gladewater WTP Improvements Phase I
Groesbeck Dam Improvements
Groesbeck Downtown EST Replacement
Groesbeck Water Distribution System
Houston Water
Facility Improvements
Jacksboro Lift Station No. 2 Replacement
Jacksboro Lost Creek Dam Evaluation & Plan
Lake Palestine Water Treatment Plant
Longview George Richey Road 18"
Longview Water Treatment Plant
Marlin DWSRF Water Treatment Plant
Marlin Water Transmission Main
Mexia Water
Treatment Plant
Morgan's Point Downtown EST
Nacogdoches Elevated Storage Tank
Nacogdoches Southside Ground Tank
Nacogdoches Water Treatment Plant
Reno TCDP Water System (ORCA)
Rockdale Water Distribution System
Selma Elavated
Storage Tank
Selma High Service Pump Station
Selma Southside Water System -IH 35 Crossing
Sugar Land 16" Water Main Ext.; S.H.6 South
Sugar Land Levee District No. 2 Culvert
Copyright© 2010 by KSA Engineers Inc.,  Site Map | Employee Access