KSA Logo
about services experience contact construction bids
space airports downtown highways parks streets wastewater water
 
Wastewater
Missouri City Construction Management - Wastewater Plant
Expansion
Missouri City, Texas
Missouri City Construction Management - Wastewater Plant
KSA Engineers, Inc. provided construction management services for the City of Missouri City Steep Bank/Flat Bank Wastewater
Treatment Plant, Phase II project. The services began in May of 2009 and was substantially complete in November 2010. The scope of
the project was to expand the plant capacity from 1.5 million gallons per day (MGD) to 3.0 MGD with a peak two hour flow of 8,333 gpm
(12 MGD)

The project was funded through certificates of obligation, MUD reimbursements, and unapplied interest and the total construction cost
of $5.3 million. The design engineer was LJA Engineering & Surveying and the general contractor on the project was Industrial TX Corp.

The existing plant was constructed in 1998 and consisted of headworks, activated sludge system, single oxidation ditch, clarifier, and
an ultraviolet disinfection system.

The 2009/2010 improvements included new headworks equipment, a second oxidation ditch, one 100’ diameter clarifier, an expansion
of the ultraviolet disinfection system to meet E. Coli standard, an expansion of the sludge pump station, new aerobic digester blowers,
and a new lab/ office building. 

KSA was responsible for providing a full time resident project representative for the project as well as providing traditional construction
administration/management services acting as the City’s agent between the Design Engineer, Contractor, and Material Testing
Laboratory.
Bastrop The Colony MUD No. 1, WWTP
Brady Aerial Sewer Line Replacement
Clute Wastewater Collection System
Collinsville WWTP Improvements
Diboll WWTP Expansion
Hondo Sanitary Sewer Evaluation Survey
Hondo TxCDBG Sewer System Improvements
East Side Extension Parallel Interceptor
Fairfield Mims Creek WWTP
Gladewater Moore Lift Station & Line Replace
Groesbeck WWTP Improvements
Longview WWTP Improvements
Marlin TxCDBG Sanitary Sewer Improvements
Mexia WWTP
Missouri City WWTP Expansion
Mount Pleasant WWTP Improvements
Northside Wastewater Treatment Plant
Prairie Creek Interceptor Sewer Line
Rockdale TxCDBG Sewer Improvements
Webster TDRA Lift Station Backup
Copyright© 2010 by KSA Engineers Inc.,  Site Map | Employee Access