Gladewater Moore Lift Station and Line P Replacement
Gladewater Moore Lift Station & Line Replacement
Gladewater, Texas
This project involved the abandonment of an old existing, problematic sanitary sewer lift station owned and maintained by the City of Gladewater and the construction of a new Moore Lift Station. The new lift station provided two submersible pumps, separate valve vault, 8” PVC force main and electrical controls. The project also provided for the replacement of approximately 2,300 feet of 18” SDR 26 PVC interceptor sewer line upstream of the new lift station. Other pipeline work associated with this project included the installation of 120 feet of steel casing by dry bore under the UPRR railroad to provide for the outfall of the new 8” force main.

The project was constructed within the construction schedule and final construction cost was approximately 7% under the contracted construction amount.

Bastrop The Colony MUD No. 1, WWTP
Brady Aerial Sewer Line Replacement
Clute Wastewater Collection System
Collinsville WWTP Improvements
Diboll WWTP Expansion
Hondo Sanitary Sewer Evaluation Survey
Hondo TxCDBG Sewer System Improvements
East Side Extension Parallel Interceptor
Fairfield Mims Creek WWTP
Gladewater Moore Lift Station & Line Replace
Groesbeck WWTP Improvements
Longview WWTP Improvements
Marlin TxCDBG Sanitary Sewer Improvements
Mexia WWTP
Missouri City WWTP Expansion
Mount Pleasant WWTP Improvements
Northside Wastewater Treatment Plant
Prairie Creek Interceptor Sewer Line
Rockdale TxCDBG Sewer Improvements
Webster TDRA Lift Station Backup
Copyright© 2010 by KSA Engineers Inc.,  Site Map | Employee Access